Why a permit lead is not a booked job

Contractors ask this a lot. Honest answer: a city permit means the drawings were approved and the work is allowed to start. It does not mean the trade work is yours.

What a permit means

When Brampton or Mississauga issues a second-unit or basement-finish permit, the city has accepted the plans. The address, permit number, issue date and work type are public. Owner name and phone are not published.

On many Brampton second-unit permits the city leaves the contractor field blank. We show that as "Contractor not published by the city." That line means no name is on the public record. It does not tell you whether someone already has the install.

Timing

We pull Brampton and Mississauga open data on Monday and send the week's list Wednesday morning (ET). Brampton's window for the Oct 27, 2026 pull was Oct 21–27. Mississauga's open data runs about 28 days behind; that pull's Mississauga window was Sep 23–29. Every lead shows its real permit date.

As of Oct 29, 2026: 73 Brampton and 16 Mississauga filtered second-unit / basement-finish leads in those windows.

Counts: stats/sul/page-counts.json (as of 2026-10-29). One count = one issued second-unit or basement-finish permit kept after filtering.

How a contractor turns a permit into work

  1. Read the lead: address, permit number, work type, and the short note on HVAC or plumbing fit.
  2. Check the city's own record with the permit number before you spend time on it.
  3. Reach the site by dropping by or sending a flyer to the address. Follow Canada's anti-spam law (CASL) if you email.
  4. Offer to quote from the approved drawings. Ask what trade work is still open.

Some jobs already have an HVAC or plumbing crew. Some do not. We will not claim either way.

Honest expectations

$45 CAD a month for the weekly list. Request a free week of your city's leads when you sign up. Cancel anytime. No contract.

Get a free sample Sign up · $45/mo

Related: City HVAC / plumbing permit fees · Service cost · What a second-unit permit is