How much does an HVAC or plumbing permit cost in Brampton and Mississauga?

Short answer for contractors: the city fee depends on the scope. Here are the flat fees we re-checked on Oct 29, 2026 against each city's published schedule.

Brampton

For a change to a heating or ventilation system (the City's HVAC package for replacing electric, oil furnace, or boiler systems with a natural-gas forced-air furnace), the City lists a permit fee of $326.21 for its standard 10-day application service. That package also asks for heat-loss/gain calculations and a ventilation design summary.

Source (checked Oct 29, 2026): City of Brampton HVAC Package PDF (revised Feb 2026).

On the 2026 permit fee schedule, stand-alone HVAC alterations and add-ons (unit heater, make-up air unit, exhaust fan, duct alterations, boiler/furnace replacement, and similar) are listed at $200.44 each. Stand-alone HVAC for occupancy groups A–F is also listed at $1.02 per m².

Source (checked Oct 29, 2026): City of Brampton 2026 Permit Fee Schedule.

We did not re-verify a single flat "standard plumbing permit" fee for Brampton from that schedule today, so that figure is left out here.

Mississauga

Mississauga's 2026 Schedule B lists these residential mechanical flat fees:

Source (checked Oct 29, 2026): City of Mississauga Building By-law Schedule B, 2026 Classes of Permits and Fees. Same figures also appear in the City's Abbreviated Building Division Fees (Feb 1, 2026).

City fees are what the homeowner or applicant pays the city. They are not your install price.

Why this matters for a lead

A second-unit or basement-finish building permit usually wraps structural, HVAC and plumbing work into one project. The homeowner already paid the city. Your quote is separate.

As of Oct 29, 2026 (America/Toronto), our filtered product leads show 73 Brampton second-unit and basement-finish permits in the Oct 21–27 window, and 16 Mississauga permits in the Sep 23–29 window. One count is one issued second-unit or basement-finish building permit kept after filtering — not every city permit.

Counts: stats/sul/page-counts.json (as of 2026-10-29). Credit: City of Brampton (CC BY); City of Mississauga Terms of Use. The cities do not endorse this service.

Get a free sample Sign up · $45/mo

Related: What a permit lead means · What a permit lead service costs · What a second-unit permit is · Brampton leads · Mississauga leads